|

Transportation and Parking

Parking Information  

Rates and locations
of lots near the
Bonaventure Hotel

 


Hotel Shuttle Schedule


 

Notice of Construction Near the Bonaventure Hotel during Convocation (printable PDF)


Metro construction is underway at Flower Street next to the Bonaventure Hotel. Using this route may delay your arrival at Convocation. Please refer to the links below or consult your preferred mobile map app or GPS for alternative routes.


Information on the Metro Regional Connector Transit Project:

  • Metro’s Regional Connector is currently being extended under Flower Street. For more information about this project and updates on construction please read the tabs “Overview” and “Construction Notices” on the City of Los Angeles’ Metro website. Under “Construction Notices” you can also link to get construction updates on Twitter.

  • You may also view the map of the project.

Bonaventure Hotel Flower Street Entrance and Parking Garage


The Bonaventure Hotel Flower Street entrance will be fully operational during Convocation, and the hotel garage can still be accessed from Flower Street. However, there will be partial closure of Flower Street itself. As a result, traffic may be slow at times and it may take longer to secure parking.


Figueroa Street is NOT affected by this street construction, so if you are parking in garages other than the Bonaventure Hotel garage, please plan your route in order to avoid Flower Street if at all possible.


You may want to allow extra time for travel and parking.